Kırşehir Basin Union Drinking Water Treatment Plant

Kırşehir / Central

Kırşehir Basin Union Drinking Water Treatment Plant

A 6,000 m³/day municipal drinking water plant with arsenic removal and ultrafiltration.

Treating the shared drinking water of 14 settlements in the Kızılırmak basin, the plant achieves arsenic below 10 µg/L with iron-based adsorption. The UF stage removes turbidity and microorganisms, and chlorine dioxide gives residual disinfection in the network.

Serving about 52,000 people, the plant was handed over with local operator training and three years of operating support.

Project Gallery

Diğer Treatment Plants

Let us analyse your water for free

Book a water analysis appointment for your home or business and receive an impartial recommendation based on the results.

WhatsApp +90 262 555 28 00 info@zulalsu.com.tr